WasteLinks
Report waste receipts to DEFRA without the spreadsheet
From 1 October 2026, waste receiving sites must report every load they accept to DEFRA's Digital Waste Tracking Service within two working days. WasteLinks logs each load at the gate and submits the record on your site's behalf.
- Log each load in under a minute — or photograph the paperwork and confirm
- Every record built in DEFRA's exact format — codes picked from lists, never typed
- Submitted through our approved connection; track the two-working-day clock per load
- Hazardous and non-hazardous covered, consignment codes included
- Corrections supported — amend a submitted record any time
- Your data stays yours — export everything as CSV
What you'll need
Your site's permit or authorisation number, and your DEFRA Digital Waste Tracking ID (we'll show you how to get one when you add your site).